market prices
AED ranges
Rather than publishing one rate, tamam shows what multiple verified vendors charge for tv mounting so you can pick the tier that fits the job and the budget.
Flat-pack assembly, standard bed or chest of drawersAED 150–300
Large wardrobe assembly with anti-tip anchoringAED 250–500
Full shower or bathroom silicone resealAED 200–400
Door realignment and hinge repair, per doorAED 100–200
the going rateAED 100–500
Nothing is charged until you have chosen a vendor and seen their number. There are no surprise call-out fees.
the feature pages · part 1
Curtain rails and blinds: the first ten minutes is all measuring
Curtain work is 80 percent measurement and 20 percent drilling, and the mistakes all happen in the first part. The technician has to establish three things before a single hole is made: whether the fixing is face-fix (into the wall above the window), ceiling-fix (up into the slab), or inside the recess; whether the ceiling at that point is actual concrete slab or a suspended gypsum ceiling with a void above it; and how much the finished curtains will weigh. A double track carrying blackout plus sheer across a three-metre villa window is a genuinely heavy, constantly moving load, and it needs brackets every 60-80 centimetres, not just one at each end.
Ceiling-fix into a suspended gypsum ceiling is the classic trap. Screws into the board alone will hold for a few weeks of gentle use and then let go, usually at 6am when someone yanks the blackout open. The correct approaches are either longer fixings that pass through the void into the concrete slab above, or rated hollow-ceiling anchors with the load spread across extra brackets. Ask your technician which one they are using; the answer tells you a lot.
the feature pages · part 2
Flat-pack assembly: cam locks, torque discipline and the anti-tip rule
Furniture assembly looks unskilled until you have watched someone do it badly. The core skill is torque discipline: most flat-pack furniture is MDF or particleboard, and the cam-lock and confirmat fittings that hold it together strip the moment they are overtightened. A pro runs a drill-driver with the clutch set low for speed, then finishes every fitting by hand. The second skill is sequence, reading the exploded diagram once, sorting fittings into trays, and building sub-assemblies flat on the floor protected by the packaging cardboard rather than on bare tile.
The non-negotiable finish item is anti-tip anchoring. Wardrobes, bookcases and tall drawer units come with wall straps for a reason, and in a household with children they are not optional. On block walls this is a two-minute plug-and-screw; on gypsum it means finding a stud or using a toggle. A technician who leaves a two-metre wardrobe freestanding on tile, in a country where almost every floor is hard tile, has skipped the most important step of the job.
the feature pages · part 3
Hanging things on walls: gypsum, solid block and the hollow-block surprise
Every hanging job starts with the same question: what is this wall? Gypsum partition takes self-drive plasterboard anchors happily for light frames, up to roughly five kilograms per point, and spring toggles or metal cavity anchors for heavier pieces; anything genuinely heavy, a large mirror, a floating shelf meant to carry books, should land on the metal studs. Solid block or concrete takes standard nylon plugs and holds almost anything, the only cost being a hammer drill and some dust management.
For gallery walls and multi-frame layouts, watch for the laser line. A cross-line laser plus paper templates taped up for approval before drilling turns a two-hour trial-and-error session into forty minutes with zero spare holes. Good finish standard: frames level and aligned to the laser, no cracked plaster around fixing points, and every anchor flush, not proud of the wall.
corrections
What goes wrong
Letting anyone seal over old silicone
New silicone does not bond to old silicone, and mould trapped underneath grows straight through the fresh bead. If the technician is not spending most of the job on removal and drying, the reseal will fail within months. Ask to see the joint clean and dry before the new bead goes in.
Fixing developer defects at your own cost
Cracked tiles, failed grout and misaligned kitchen units in a new handover are usually the developer's obligation during the defects liability period. Paying a handyman to fix them both costs you money and can undermine the official snag claim. Document and report first; hire for the jobs the developer never owed you.
Judging the quote instead of the method
The cheapest quote often prices a different job: silicone over silicone, plugs instead of proper anchors, no anti-tip strap on the wardrobe. When quotes differ widely, ask each vendor how they will do the job. The one who mentions wall type, anchors and cure times without prompting is usually the one worth paying.
letters to the editor
Frequently asked questions
letter no. 1
Do handymen bring their own tools and materials?
the desk replies — Tools, yes, always: drills, levels, anchors and consumables like screws and basic plugs are part of the service. Specific hardware is different: TV brackets, curtain rails, mirrors, shelves and replacement hinges are normally customer-supplied unless the quote says otherwise. Confirm the split when you accept the quote so nobody is standing in a hardware store mid-visit.
letter no. 2
Can a handyman do electrical or plumbing work?
the desk replies — Only at fixture level: swapping a light fitting, changing a tap washer, fitting an appliance. New wiring, new power points, anything at the distribution board, or work on supply pipework needs a licensed electrician or plumber under DEWA, SEWA or ADDC and municipality rules. A good handyman will tell you where that line is rather than crossing it.
letter no. 3
Do I need building permission before a handyman can drill?
the desk replies — In many Dubai and Abu Dhabi towers and masterplanned communities, yes: management requires a work permit or NOC, and often restricts noisy work to set weekday hours. Villas and most older buildings need nothing formal beyond a word with the watchman. Check with your building before booking, because a technician turned away at security still counts as a visit.
letter no. 4
How far ahead should I book?
the desk replies — In Dubai, Sharjah and Abu Dhabi, next-day slots are usually realistic and same-day is possible for simple jobs. In RAK, Fujairah and UAQ, where many teams travel from other emirates, one to two days ahead is safer. Move-in season, September and the weeks around school start, tightens availability everywhere.
letter no. 5
What happens if the job takes longer than quoted?
the desk replies — It depends on whether the scope changed. If you added tasks on the day, expect the price to move, agree the addition before the extra work starts. If the scope is unchanged and the technician simply underestimated, a fixed quote should hold, which is one reason to get quotes against a full photo-documented list rather than a vague description.
letter no. 6
Do you cover Al Nuaimiya?
the desk replies — Yes — Al Nuaimiya is covered across Ajman, with vendors who regularly work the area. Availability shows live in the app.