the feature pages · part 1
Curtain rails and blinds: the first ten minutes is all measuring
Curtain work is 80 percent measurement and 20 percent drilling, and the mistakes all happen in the first part. The technician has to establish three things before a single hole is made: whether the fixing is face-fix (into the wall above the window), ceiling-fix (up into the slab), or inside the recess; whether the ceiling at that point is actual concrete slab or a suspended gypsum ceiling with a void above it; and how much the finished curtains will weigh. A double track carrying blackout plus sheer across a three-metre villa window is a genuinely heavy, constantly moving load, and it needs brackets every 60-80 centimetres, not just one at each end.
Ceiling-fix into a suspended gypsum ceiling is the classic trap. Screws into the board alone will hold for a few weeks of gentle use and then let go, usually at 6am when someone yanks the blackout open. The correct approaches are either longer fixings that pass through the void into the concrete slab above, or rated hollow-ceiling anchors with the load spread across extra brackets. Ask your technician which one they are using; the answer tells you a lot.
the feature pages · part 2
Silicone resealing: the ninety-minute job everyone quotes at thirty
Blackened silicone around a shower tray or kitchen sink is probably the most common small job in UAE bathrooms, and it is also the most commonly botched, because the visible part (running a new bead) is the quick part. The job is really a removal job. Every trace of the old sealant has to come out: cut free with a blade, scraped, then the residue dissolved or abraded away, because new silicone will not bond to old silicone and any mould left in the joint grows straight through the fresh bead within months.
Then comes the part no one budgets for: cure time. Sanitary silicone needs roughly 24 hours before the shower runs again; using it the same evening washes out the surface skin and the bead fails early. A full shower enclosure reseal is 60-90 minutes of work plus that day of patience. Quality check a week later: the bead is uniform width, bonded on both edges with no lifting corners, and water sheets off it rather than creeping underneath.
the feature pages · part 3
Judging the finished work: the five-minute walkthrough before the van leaves
Every job in this guide has an objective pass test, and the time to apply it is while the technician is still in your home. Pull firmly on every bracket, rail and mount, a proper fixing does not move at all, and a professional will do this pull test in front of you without being asked. Sight along rails and frames or ask for the laser to be held up one last time. Open and close every adjusted door at normal speed. Run a finger along silicone lines to check the edges are bonded (gently, and only if the bead has skinned). Count the holes: there should be exactly as many as there are fixings, and any abandoned holes should have been filled before the tools were packed.
Then look down. Dust and packaging are part of the job, not your problem after it: block-drilling dust vacuumed rather than swept into grout lines, cardboard and offcuts removed, protective film peeled off new hardware. Take photos of the finished work while everything is fresh, they are useful if anything settles or loosens in the first weeks.
market prices
Budgeting for this
picture hanging generally falls in the AED 100–500 band. Comparing several verified vendors on the same job description is what stops you overpaying.
Standard call-out including first hour of labourAED 100–200
Flat-pack assembly, standard bed or chest of drawersAED 150–300
Large wardrobe assembly with anti-tip anchoringAED 250–500
Full shower or bathroom silicone resealAED 200–400
the going rateAED 100–500
Final pricing comes from the vendor option you pick in the app — you see the quotes before you commit.
corrections
Common missteps
Booking one small job at a time
Every visit carries the call-out minimum, so three single-job bookings can cost more than one half-day visit that clears ten jobs. Keep a running list on your phone and book when it reaches three or four items. Vendors also quote batched work more competitively because their travel time is spread across more billable tasks.
Putting a full-motion TV arm into bare plasterboard
An articulating arm multiplies the TV's weight into leverage at a few fixing points, and plastic plugs in gypsum cannot resist it. The mount holds during the demo and fails weeks later. Insist on metal studs, a backing board, or a different wall.
Skipping the building permit and losing the slot
In permit-controlled towers, a technician stopped at security is a wasted visit that you may still be charged for. Five minutes with building management before booking, asking about NOCs, service-lift rules and drilling hours, protects both your slot and your deposit with the building.
letters to the editor
Frequently asked questions
letter no. 1
Do I need building permission before a handyman can drill?
the desk replies — In many Dubai and Abu Dhabi towers and masterplanned communities, yes: management requires a work permit or NOC, and often restricts noisy work to set weekday hours. Villas and most older buildings need nothing formal beyond a word with the watchman. Check with your building before booking, because a technician turned away at security still counts as a visit.
letter no. 2
How far ahead should I book?
the desk replies — In Dubai, Sharjah and Abu Dhabi, next-day slots are usually realistic and same-day is possible for simple jobs. In RAK, Fujairah and UAQ, where many teams travel from other emirates, one to two days ahead is safer. Move-in season, September and the weeks around school start, tightens availability everywhere.
letter no. 3
What happens if the job takes longer than quoted?
the desk replies — It depends on whether the scope changed. If you added tasks on the day, expect the price to move, agree the addition before the extra work starts. If the scope is unchanged and the technician simply underestimated, a fixed quote should hold, which is one reason to get quotes against a full photo-documented list rather than a vague description.
letter no. 4
Can a handyman fix the snags in my brand-new apartment?
the desk replies — They can, but often should not, yet. Genuine construction defects belong on the developer's snag list inside the defects liability period, usually twelve months, and fixing them privately can weaken your claim. Document defects with the developer first, then use a handyman for everything the developer never owed you: mounting, rails, assembly and the move-in list.
letter no. 5
Do handymen work weekends and evenings in the UAE?
the desk replies — Most vendors work Saturdays and many work Sundays, which suits commuting households, but tower rules can override this: plenty of buildings ban drilling on weekends or after 6pm. Quiet jobs, assembly, silicone, door adjustment, are usually fine any day. Check your building's noisy-work hours before booking a weekend slot.
letter no. 6
Do you cover Madinat Jumeirah Living?
the desk replies — Yes — Madinat Jumeirah Living is covered across Dubai, with vendors who regularly work the area. Availability shows live in the app.