ttamamusually replies in minutes11:42
pinnedrange AED 150–600time needed 1–3 hoursserving Karamabook via app or whatsapp
need electrician in karama — today if possible11:42✓✓
Residents across Karama book electrician through tamam because the model is simple — licensed vendors, transparent pricing, in-app tracking, and the same provider again next time if you liked them.11:43
typical ranges vendors quote around karama —Socket or switch replacement, per pointAED 150–250New socket point as a spur on an existing circuitAED 180–350Light fixture or ceiling fan installation, standard ceilingAED 150–35011:44
that works. who actually turns up?11:45✓✓
licensed vendors only — the licence and vendor ID land in this chat before anyone rings your bell.11:46
What you should expect to pay
Expect AED 150–600 as the working range for electrician in Karama. What moves it: job size, access difficulty, materials, and whether you want the value or premium tier.
Socket or switch replacement, per pointAED 150–250
New socket point as a spur on an existing circuitAED 180–350
Light fixture or ceiling fan installation, standard ceilingAED 150–350
Chandelier installation with assembly, high ceilingAED 350–600
RCD or breaker replacement in the DBAED 200–450
Final pricing comes from the vendor option you pick in the app — you see the quotes before you commit.
The tower renter: what is yours, what is the building's, what is the landlord's
In an apartment, three parties share the electrical picture. The utility owns everything up to your meter. The building owns the risers, common-area wiring and the supply into your flat. Everything after your DB is the landlord's asset, and your tenancy contract decides who pays for repairs; the common UAE convention is that minor repairs below a threshold written into the contract fall to the tenant, while anything structural or aging-related is the landlord's problem. Read that clause before you spend anything, and photograph faults so the conversation stays factual.
Towers add a layer of process. Most managed buildings in Dubai Marina, JLT, Reem Island or Al Majaz require a work permit for any contractor entering the building, often restricted to weekday daytime hours, sometimes with a requirement that the company carries insurance. For a simple socket swap this is usually waved through at the security desk; for anything involving drilling or wall chasing, the building may want the landlord's no-objection letter first. Ask your building management what they need before the electrician is standing in the lobby.
Where a handyman stops and an approved contractor begins
Handyman-level work, which most tamam electrical bookings fall into, covers fault finding, socket and switch replacement, adding a socket as a spur on an existing circuit, light fixture and fan installation, water heater replacement on an existing point, and appliance connections. The technician should still be a trained electrician; handyman-level describes the regulatory weight of the job, not the skill it needs.
The boundary matters for more than compliance. Home insurance can walk away from a fire claim traced to unapproved modification of the fixed installation, and villa owners feel it at resale, when a buyer's inspection flags a DB full of undocumented additions. If a vendor quotes you for a load increase or a DB replacement without mentioning utility approval or an inspection step, that is your cue to ask harder questions or find another vendor.
Frequently asked questions
Can a handyman add a new socket, or does that need DEWA approval?
A socket added as a spur from an existing nearby circuit is handyman-level work and needs no utility involvement, though in a rental you need landlord permission for anything cut into walls. A new circuit from the DB, a board upgrade or an increase in connected load crosses into approved-contractor territory with DEWA, SEWA, ADDC or Etihad WE, depending on your emirate.
My whole flat lost power but the neighbours are fine. Who do I call?
First check your own DB: if the main isolator or RCD has dropped, reset it once. If the board is fully on but the flat is dead, the fault is likely at the meter or the building's riser, which is the utility's or building management's side. Call the building's maintenance desk or the utility's fault line; a private electrician cannot legally open that part of the installation.
How long does light fixture installation take, and can I supply my own fixture?
A standard fixture on a normal ceiling takes thirty to sixty minutes; chandeliers with assembly and high ceilings can run to two or three hours. Supplying your own fixture is normal and usually cheaper, just have it on site before the visit and mention ceiling height and material, since concrete slab and gypsum need different fixings.
What is an RCD, and why does mine trip when the washing machine runs?
An RCD cuts power within milliseconds when current leaks to earth, which is what stops a faulty appliance from electrocuting someone. Washing machines trip it when their heating element's insulation degrades, a very common failure in the UAE's hard water conditions. The fix is repairing or replacing the appliance, never swapping the RCD for a less sensitive one.
How do I know the electrician I am booking is actually qualified?
Legitimate operators work under a licensed company rather than as anonymous freelancers, and for regulated work they should name their utility approval without being pressed. Booking through tamam adds a layer, since listed vendors are verified and the job, payment and history are recorded in the app, which also makes it easy to rebook the same technician who already knows your board.
Do you cover Karama?
We cover Karama and the surrounding Dubai communities. Message on whatsapp if you want a specific time confirmed first.