ttamamusually replies in minutes11:14
pinnedrange AED 150–600time needed 1–3 hoursserving Al Nahda Sharjahbook via app or whatsapp
need db board repair in al nahda sharjah — today if possible11:14✓✓
tamam covers Al Nahda Sharjah for electrician the same way it covers every UAE community: multiple vetted vendors, AED ranges you can see up front, and booking that takes a couple of taps.11:15
typical ranges vendors quote around al nahda sharjah —Socket or switch replacement, per pointAED 150–250New socket point as a spur on an existing circuitAED 180–350Light fixture or ceiling fan installation, standard ceilingAED 150–35011:16
that works. who actually turns up?11:17✓✓
licensed vendors only — the licence and vendor ID land in this chat before anyone rings your bell.11:18
The landlord between tenants: a two-hour audit that prevents deposit disputes
A competent electrician can audit a one- or two-bedroom flat in a couple of hours: test every socket with a tester, press-test each RCD, check water heater elements for earth leakage before they become the next tenant's mystery trip, tighten DB terminals that loosen with thermal cycling, replace yellowed or cracked switch plates, and label the DB so the next occupant is not flipping breakers at random. In villas, add the garden circuits and the external water heater cupboards, which bake in the sun.
If you manage several units, consistency is worth more than any single cheap visit. Booking through tamam lets you rebook the same vendor across units and tenancy changeovers, so the person who labelled the DB in unit 704 is the one who answers when unit 1102 starts tripping, and the payment and job history sit in the app rather than in a folder of WhatsApp screenshots.
AED ranges
Rather than publishing one rate, tamam shows what multiple verified vendors charge for db board repair so you can pick the tier that fits the job and the budget.
Socket or switch replacement, per pointAED 150–250
New socket point as a spur on an existing circuitAED 180–350
Light fixture or ceiling fan installation, standard ceilingAED 150–350
Chandelier installation with assembly, high ceilingAED 350–600
RCD or breaker replacement in the DBAED 200–450
Final pricing comes from the vendor option you pick in the app — you see the quotes before you commit.
Frequently asked questions
Why does my breaker trip every time it rains or the humidity spikes?
Moisture is getting into an outdoor fitting, balcony socket, external water heater cupboard or garden joint and leaking current to earth, which the RCD correctly detects. It feels random because it follows weather, not usage. An electrician isolates circuits at the DB and tests insulation resistance to find the wet point, then re-terminates it in a properly sealed enclosure.
Can a handyman add a new socket, or does that need DEWA approval?
A socket added as a spur from an existing nearby circuit is handyman-level work and needs no utility involvement, though in a rental you need landlord permission for anything cut into walls. A new circuit from the DB, a board upgrade or an increase in connected load crosses into approved-contractor territory with DEWA, SEWA, ADDC or Etihad WE, depending on your emirate.
My whole flat lost power but the neighbours are fine. Who do I call?
First check your own DB: if the main isolator or RCD has dropped, reset it once. If the board is fully on but the flat is dead, the fault is likely at the meter or the building's riser, which is the utility's or building management's side. Call the building's maintenance desk or the utility's fault line; a private electrician cannot legally open that part of the installation.
How long does light fixture installation take, and can I supply my own fixture?
A standard fixture on a normal ceiling takes thirty to sixty minutes; chandeliers with assembly and high ceilings can run to two or three hours. Supplying your own fixture is normal and usually cheaper, just have it on site before the visit and mention ceiling height and material, since concrete slab and gypsum need different fixings.
Is it worth adding RCD protection to an older building's board?
Yes, and it is one of the cheapest safety upgrades available. Many pre-2000s buildings in Deira, Ajman and UAQ still have boards with MCBs only, meaning nothing detects earth leakage from a failing heater or damaged cable. Adding RCD protection is a board-level job, so use a properly licensed electrician and expect a short power shutdown during the work.
Do you cover Al Nahda Sharjah?
We cover Al Nahda Sharjah and the surrounding Sharjah communities. Message on whatsapp if you want a specific time confirmed first.
Avoid these
Resetting a tripping breaker over and over without finding the cause
A breaker that keeps dropping is doing its job; the fault is still there. Repeated forced resets stress the breaker and, in worn boards, can overheat the buswork behind it. Reset once after unplugging the circuit's appliances; if it will not hold, stop and book a diagnosis.
Buying the appliance or fixture before checking the ceiling or the board
The induction hob that needs a dedicated circuit your DB cannot spare, the chandelier your gypsum ceiling cannot carry, the dimmer your LED lamps do not support: all cheaper to discover before purchase. A short survey visit or even photos sent ahead prevents owning hardware you cannot install.
Treating outdoor electrics like indoor electrics
Indoor-grade junction boxes in flowerbeds, unrated extension cords feeding garden lights and balcony sockets without covers all fail the same way: moisture gets in, the RCD starts tripping, and the search for the wet joint costs more than proper IP-rated fittings would have. Outdoors, specification is the economy.