What is a handyman term contract?
A contract with fixed unit rates for small jobs, called off by ticket over one or two years. You do not commit to a volume; you pay for each job ordered at the agreed rate.
It suits portfolios where repairs are frequent but small: door handles, curtain rails, silicone, TV mounting, furniture assembly, minor plumbing and electrical swaps. A landlord in Dubai carries the maintenance duty during the lease unless the contract says otherwise, so many property managers use a term contract to handle that duty across all their units.
What should the schedule of rates include?
Your top 30 to 50 job types with a fixed price each, plus an hourly rate for anything not listed. Base the list on last year's tickets.
- Carpentry: hinge, lock and handle replacement, door alignment, cabinet repair
- Fixing and mounting: curtains, blinds, TVs, shelves, mirrors, artwork
- Sealants: bath and kitchen silicone renewal per linear metre
- Minor plumbing: tap cartridge, mixer, toilet seat, flush valve
- Minor electrical: socket, switch, light fitting swap like for like
- Smart home: door lock, camera or doorbell install, where in scope
- Hourly rate, minimum charge and call-out charge
- Material markup or client-supplied materials
How do you control quality on hundreds of small jobs?
Require a ticket per job with before and after photos, the time on site and the occupant's sign-off. Then audit a sample each month.
Ask how the bidder assigns jobs, confirms appointment windows with occupants and closes tickets. A 'first-time fix' rate and a re-visit count per month are simple KPIs that catch weak work quickly.
How do access and tenant rules affect a handyman contract?
Occupied units need an appointment and occupant consent. Write the access process into the tender so bidders can price wasted trips.
State who books the appointment (you or the contractor), what happens when nobody is home, and whether a no-access visit is charged. In Dubai, Article 19 of Law No. 26 of 2007 limits what tenants can do on their own, so tenant requests usually go through the landlord or manager. Your ticket process should reflect that.
What does Tamam need to decide whether to bid?
The site list, last year's job mix if you have it, your rate schedule template and the deadline. Tamam reviews the scope and replies whether it will quote.
Availability, scope and commercial terms are confirmed for each project individually. If you need specific licences or insurance, put them in the prequalification list and Tamam will reply with what it can provide for that scope.
What to send Tamam with the invitation
- Tender or RFQ documents
- Site or unit list with emirate and community
- Last 12 months of job tickets or a job type summary
- Schedule of rates template to price
- Appointment and access process for occupied units
- Ticketing system or reporting format
- Term, start date and submission deadline