Who pays for repainting between tenants in Dubai?
It depends on the cause. Normal wear and tear sits with the landlord; damage beyond that can be claimed from the outgoing tenant under the tenancy contract.
Dubai Law No. 26 of 2007 says the tenant returns the unit in the condition received, except ordinary wear and tear, and the landlord carries wear and tear not caused by the tenant. In practice, managers repaint at each turnover and use the move-in and move-out inspection photos to decide what to recover from the deposit. Your painting contractor's job sheet should record the condition found, so it supports that decision.
How should repainting be priced in the tender?
Fixed prices per unit type for a standard repaint, plus unit rates for extras. Fixed prices make monthly budgets predictable.
- Studio, 1BR, 2BR, 3BR apartment: walls and ceilings, one colour
- Villa by bedroom count, with or without maid's room
- Extras: doors and frames per leaf, skirting per metre, feature wall, wardrobe interiors
- Repairs before paint: crack filling, patching after TV mounts, damp stain treatment
- Exterior or balcony work as separate lines
- Same-day surcharge for urgent turnovers, if you need it
What paint specification should the tender set?
Name the product range or the performance you expect, the colour code and the number of coats. Leaving it open invites the cheapest emulsion.
State matt or silk finish for walls, ceiling white, colour reference, primer or sealer for patched areas and two finish coats. Ask for product data sheets. For Dubai projects, you can ask bidders whether the paint carries a Dubai Central Laboratory certificate under Al Sa'fat, which covers limits on VOC content for interior paints.
What turnaround and snag rules work for vacant units?
Set a maximum number of working days from key handover to completion per unit type, and a snag close-out window. Then measure both.
- Key collection and return process with the building management office
- Floor, switch and fitting protection, and who cleans afterwards
- Snag walk with your inspector, photos, and a fix window
- Building rules: working hours, lift booking, debris removal
- Coordination with move-out cleaning so the two crews do not overlap
What does Tamam need to decide whether to bid?
The unit mix and locations, expected volume per month, the paint spec and the deadline. Tamam reviews these and replies whether it will quote.
Availability, scope and commercial terms are confirmed individually for each project. If you need specific licences or insurance, list them and Tamam will reply with what it can provide for that scope.
What to send Tamam with the invitation
- Tender or RFQ documents
- Unit mix by type, with community or building names
- Expected turnovers per month
- Paint brand or performance spec, colour codes and coats
- Target turnaround days per unit type
- Building rules for contractors and key handover process
- Submission deadline