# Post-construction and handover cleaning tenders: scope, phases and risks

A handover cleaning tender should split the work into rough clean, fine clean and final touch-up, fix who removes debris, and tie each phase to the snag and handover dates. Send Tamam the unit schedule and programme to get a bid decision.

## Key facts

- In Dubai, the owner or contractor is responsible for public health pest control during construction and for the building being free from pests when works finish (Local Order No. 11 of 2003, Article 38).
- The same order makes the occupant responsible for pest control in the part of the building it occupies after that (Article 38).
- Dubai Municipality may require waste to be moved by the company's own vehicles or by a company licensed to transport waste (Article 62).
- Tamam confirms scope, sites, availability and terms individually for each project.

## What phases should a handover cleaning tender include?

Three phases: a rough clean after trades finish, a fine clean before snagging, and a final touch-up just before keys are handed over. Price each phase separately.

Construction rarely finishes evenly. Some floors are ready while others still have painters. A phased price lets you release one floor or block at a time without paying for a full mobilisation each time.

- Rough clean: remove packaging, offcuts, loose debris, protective films where trades allow
- Fine clean: cement and paint splash removal, glazing inside and out where reachable, sanitaryware, kitchen units, inside cabinets, AC grilles
- Final touch-up: dust settle, floor finish, mirrors, door hardware, after snag rectification

## Who removes construction debris and how?

State whether the main contractor clears bulk debris and skips, or whether the cleaning bidder must bag and move waste to a collection point. This changes the price a lot.

In Dubai, the municipality can require waste to go by the generator's own vehicles or by a licensed waste transport company. Name who holds the skip contract and where cleaners must take bagged waste. Do not leave this to the cleaning bid by default.


## What surfaces carry the most risk in a builders' clean?

Glass, natural stone, stainless steel and new timber. Wrong chemicals or scraping methods can scratch or etch finishes that are hard to replace.

Ask bidders for a method statement per finish: how they remove cement haze from porcelain tiles, paint dots from glass, silicone smears from stone and adhesive from stainless steel. Ask for the chemicals list and safety data sheets. Require a trial area signed off by your site team before full mobilisation, especially on marble and feature walls.


## How should pest control fit into the handover?

Plan a pest inspection and treatment before handover, because Dubai places pest control during construction and a pest-free building at completion on the owner or contractor.

Construction sites attract cockroaches and rodents through open drains, food waste from labour and stored materials. Include a pest control visit by a Dubai Municipality approved company in the scope, or as a separate line, timed after the fine clean and before final touch-up. Ask for the treatment report to go into the handover file.


## What access, HSE and working-at-height items should the tender cover?

Site induction, permit to work rules, PPE, and how external glazing and high-level surfaces will be reached.

- Induction requirements and who runs them
- PPE the cleaners must wear on an active site (helmet, boots, high-visibility vest, gloves)
- Whether ladders, mobile towers or rope access are needed and who provides them
- Water and power points the cleaners may use
- Welfare facilities and storage for equipment on site

## How does Tamam respond to a handover cleaning tender?

Send the unit schedule, programme and tender documents. Tamam reviews scope, sites and deadline and replies whether it will bid.

For large projects, invite Tamam to a site walk before pricing. Ask Tamam for insurance, method statements and any documents your HSE team needs with the quote.


## What to send Tamam with the invitation

1. Project name, location and unit or floor schedule
2. Programme with phase dates and handover target
3. Finishes schedule (stone, glass, timber, stainless steel)
4. Debris and skip arrangements and who holds the waste contract
5. Site HSE rules, induction and permit to work requirements
6. Water, power and storage available to cleaners
7. Whether pest control before handover is in scope
8. Tender documents and submission deadline

## Practical questions

### Can you clean occupied floors while other floors are still under works?

Phased handover is common. Give the phase plan and Tamam will confirm what it can offer for each release.

### Is external facade cleaning included?

Only if you include it. Facade and high-level glazing need a separate method and access plan, so list it as its own line.

### Do we need a separate pest control contractor?

You can include pest control in the same tender as a separate line. The work must be done by a company approved by the relevant authority.

### How soon can Tamam give a bid decision?

That depends on scope and deadline. Send the tender pack and Tamam will reply with its decision.