---
title: Electrical Maintenance Contract Tender UAE | Tamam
description: Electrical maintenance tender for a UAE building? DB checks, thermography, lighting, utility-approved contractor rules, and how to invite Tamam.
canonical: https://gettamam.ae/en/business/tenders/electrical-maintenance-contract/
language: en
publisher: Tamam (gettamam.ae)
---

# Electrical maintenance contract tenders: what to ask for in the UAE

Tamam accepts invitations to bid on electrical maintenance contracts for buildings, offices and retail sites across the UAE. Send the DB schedule, sites, scope and deadline to admin@tamam.email or WhatsApp, and Tamam replies whether it will quote.

## Key facts

- DEWA enrols electrical contractors in Dubai; its enrolment list asks for a trade licence, VAT letter, engineer qualification and supervision experience.
- In Abu Dhabi, ADDC and AADC assess and license electrical contractors for installation work under Department of Energy authority.
- Abu Dhabi licensing of contractors covers low voltage installation work; high voltage is outside that process.
- Maintenance of existing circuits and new installation work can fall under different rules, so separate them in the tender.

## What is the difference between electrical maintenance and electrical installation in a tender?

Maintenance keeps existing circuits safe and working. Installation adds or changes circuits, and in the UAE that usually needs a contractor approved by the utility.

In Dubai, DEWA keeps an enrolment process for electrical contractors and consultants. In Abu Dhabi, ADDC and Al Ain Distribution Company assess and license contractors for low voltage installation work in buildings. If your tender includes new circuits, DB upgrades or load changes, say so and ask bidders to state their utility approval for the emirate concerned. In other emirates, check the rule with the local utility (for example SEWA in Sharjah).


## Which electrical tasks should the PPM schedule cover?

List each task with a frequency. Vague lines like 'maintain electrical systems' cannot be checked.

- DB and SMDB inspection: tightness of terminations, signs of overheating, labelling
- Thermographic survey of main panels, with report and photos
- RCD/ELCB trip test and record
- Earthing continuity and resistance checks
- Common area and car park lighting: lamp and driver replacement, timer and photocell settings
- Emergency lighting functional test, if it is in this contract and not in the fire systems contract
- Generator and ATS checks, if present

## What safety controls should the tender demand?

A written isolation procedure, a permit to work for live panels, and qualified staff named on the site. Ask for them as submittals, not promises.

Request a method statement and risk assessment for panel work, the lock-out tag-out procedure, PPE list for arc risk, and the qualification of the supervising engineer or foreman. Ask how the bidder will isolate supply to occupied units and how much notice tenants get.


## How should electrical call-outs be priced?

Split them into what the monthly fee covers and what is charged. State a parts approval threshold so small fixes are not held up.

- Included: fault finding, breaker resets, minor repairs under a set material value
- Chargeable with approval: breaker and RCD replacement, cable runs, light fittings
- Emergency call-out outside hours: response time and rate
- Monthly report: faults, root cause, repeat faults by DB

## What does Tamam need to decide whether to bid?

The DB schedule or single line diagram, site list by emirate, whether installation work is in scope, and the deadline. Tamam reviews these and replies whether it will quote.

Availability, scope and commercial terms are confirmed individually per project. If the tender asks for a DEWA, ADDC or other utility approval, list it in the prequalification requirements and Tamam will reply with what it can provide for that scope.


## What to send Tamam with the invitation

1. Tender or RFQ documents
2. DB schedule or single line diagram for each site
3. Site addresses and emirate
4. Whether new installation or load change work is in scope
5. PPM task list and frequency you expect
6. Working hour limits and shutdown notice rules
7. Prequalification list and submission deadline

## Practical questions

### Is a thermographic survey worth adding as a one-off?

Many owners run one at contract start to set a baseline. Add it as a separate priced item so it can be accepted or removed.

### Can emergency lighting be in the electrical contract?

It can, but emergency lighting often sits in the fire and life safety contract. Pick one and say so, so it is not missed or paid twice.

### Does Tamam bid on electrical work in Abu Dhabi and Sharjah?

Tamam reviews invitations from all seven emirates. Name the emirate and any utility approval needed, and Tamam replies whether it will quote.

### What if we only have a rough DB count?

Send what you have and offer a site visit. Bidders can confirm quantities before submission.

## Sources

- [DEWA: Enrolment of Consultants and Contractors](https://dewa.gov.ae/en/about-us/service-guide/general-information/enrollment-of-consultants-contractors) (checked 2026-11-23)
- [DEWA: Builder Enrollment Consultant and Contractor Guide](https://dewa.gov.ae/-/media/Files/Builder/Enrollment-Guide/Builder-Enrollment-Consultant-and-Contractor-Guide.ashx) (checked 2026-11-23)
- [ADDC: Information for contractors](https://www.addc.ae/en-US/distribution/Pages/Contractors.aspx) (checked 2026-11-23)
- [ADDC: Process for Approval of Licensed Contractors](https://www.addc.ae/en-US/distribution/Documents/Process%20For%20Approval%20of%20Licened%20Contractors.pdf) (checked 2026-11-23)

---
Invite Tamam: admin@tamam.email · WhatsApp +971 50 601 1938
