# AC maintenance contract tenders for UAE buildings and portfolios

Tamam accepts invitations to bid on AC maintenance contracts for apartment portfolios, villa communities, offices and shops in all seven emirates. Send the unit list by type, the sites and your deadline to admin@tamam.email or WhatsApp, and Tamam replies whether it will quote.

## Key facts

- Dubai Municipality's fitness centre guideline (V5, April 2026) requires AC and ventilation systems to be inspected at least quarterly, with inspections recorded.
- The same guideline says ducts should be cleaned at least once every three years, or straight after microbiological contamination is found, by certified companies.
- Dubai Municipality's Legionella guideline lists cooling towers, evaporative condensers and air washers as water systems that need a control programme.
- Sector rules differ: check the Dubai Municipality guideline for your building type before fixing visit frequencies.

## What should an AC maintenance tender list?

Every unit by type and capacity, where it sits, and who can access it. Split units, ducted DX, FCUs on chilled water and package units are priced very differently.

- Unit count by type: wall split, ducted split, cassette, FCU, package unit, VRF indoor and outdoor
- Capacity in tons or kW and approximate age
- Location: inside occupied units, ceiling voids, roof, plant room
- Access rules: tenant appointment needed, roof permit, working hours
- Chilled water supplier interface, if the building is on district cooling
- Thermostats and controls in scope or out

## How often should AC units be serviced under the contract?

State the visit frequency and what each visit includes. A quarterly inspection with a deeper clean before summer is a common pattern, but your building type may have its own rule.

For example, Dubai Municipality's fitness centre guideline asks for quarterly inspections recorded in a technical log, a yearly updated maintenance plan, filter cleaning or replacement, cooling coil inspection and cleaning, fresh air unit cleaning and checks that drain pans are clear of blockages and fungal growth. Use that list as a model for what a visit should cover, and check the guideline that applies to your premises.

Write the visit checklist into the tender: filter wash or replace, coil clean (in place or chemical), drain line flush, condensate pan treatment, refrigerant pressure check, electrical terminal check, amps reading and thermostat test.


## Should duct cleaning be inside the AC contract?

Price it as a separate line. Duct cleaning is a different crew, different equipment and a different frequency from routine servicing.

The Dubai Municipality fitness centre guideline sets duct cleaning at least once every three years, or immediately after microbiological contamination, by certified companies. Ask bidders to quote per unit or per metre run, and to say which certification they hold for duct cleaning. Ask for before and after photos or video as the completion record.


## What SLA terms fit an AC contract in UAE summer?

Separate priority levels for summer and winter, and a definition of 'no cooling' versus 'reduced cooling'. Summer demand is what breaks weak contracts.

- Priority 1: no cooling in an occupied home, server room or clinic area
- Priority 2: reduced cooling, water leak from indoor unit
- Priority 3: noise, remote faults, cosmetic issues
- Gas top-up policy: included, capped per unit per year, or chargeable
- Compressor and PCB replacements: chargeable with approval above a set value
- Monthly report per site with unit-level history

## What does Tamam need to decide whether to bid?

The unit list, the sites and emirates, how access works, the term and the deadline. Tamam reviews these and replies whether it will quote.

Availability, scope and commercial terms are confirmed for each project individually. If your tender needs specific licences, certifications or insurance, put them in the prequalification list and Tamam will reply with what it can provide for that scope.


## What to send Tamam with the invitation

1. Tender or RFQ documents
2. Unit list by type, capacity and location
3. Site addresses, emirate and number of occupied units
4. Access rules for tenant-occupied units and roofs
5. Required visit frequency and visit checklist, if you have one
6. Whether duct cleaning, gas top-ups and parts are in scope
7. Term, start date, site visit date and submission deadline

## Practical questions

### Can Tamam quote AC maintenance for a villa community where each villa books its own slot?

Send the number of villas, unit types and how residents will be contacted. Tamam reviews the access model and replies whether it will quote.

### Is a one-off pre-summer service tender possible instead of an annual contract?

Yes. Say it is a one-off, give the unit count and the window, and Tamam will reply on whether it can cover it.

### Who supplies refrigerant and filters?

State it in the tender. Most contracts include filters and consumables and price refrigerant and major parts separately.

### Do cooling towers fall under the AC contract?

Only if you put them in. In Dubai they also fall under the Legionella guideline, so list the water treatment and cleaning duty as its own item.

## Sources

- [Dubai Municipality, Technical Guidelines on Health and Safety Requirements for Fitness Centers (DM-HSD-GU13-FCC2, V5, 14 Apr 2026), section 13-2](https://dmpmedia.dm.gov.ae/uploads/2026/06/Technical-Guidelines-on-Health-and-Safety-Requirements-for-Fitness-Centers-Men-and-WomenV5.pdf) (checked 2026-11-23)
- [Dubai Municipality, Technical Guidelines for Legionella Control in Water System (DM-HSD-GU44-LCWS2, V6, 19 Aug 2025)](https://dmpmedia.dm.gov.ae/uploads/2022/10/DM-HSD-GU44-LCWS2_Technical-Guidelines-for-Legionella-Control-in-Water-System_V6-002.pdf) (checked 2026-11-23)

---
Invite Tamam: admin@tamam.email · WhatsApp +971 50 601 1938